SuZhou Tonkida Electromechanical Technology Co., Ltd
Pho:13913521916
Tel:0512-65637950
Fax:0512-65637950
Add:No. 6 Tengqi Street, Wuzhong District, Suzhou City, Jiangsu Province, China
Now:Home>>News>>Company news
Classification:Company news Release time:2024-05-10 395 hits
The machine is placed in a strong wooden...
The machine is placed in a strong wooden box. After the box is opened with a screwdriver, the machine is carefully moved away from the wooden box with a forklift truck. Then the multiple foam is removed and the anti-static steam beads are removed.
After removing the multiple foam and removing the anti-static foam, place the machine on a firm, flat surface and unlock it by following these steps:
1. Unfasten the temporary device that fixes the head during transportation.
2. Move the pickup and placement head to the middle of the machine.
3. Unfasten the Z-axis and remove the Z-axis foam pack.
4, Install the accident alarm light on the top and insert the four-pin connector.
5, adjust the screw of the machine foot, so that the machine is in a horizontal state, and the eight feet are stable contact with the ground.
6, adjust the level: use the level to adjust the front and back X axis, and then Y axis, adjust the eight feet to complete it.
Note: Calibrate the machine after each reposition. After physical CALIBRATION, the user must run the SYSTEM CALIBRATION software to re-detect the A mark.
7. Install air filter.
8, install the conveyor belt and other optional parts (if with).